平码主论坛
The Official Website of the People’s Government of Hunan Province Mobile 中文 Francais ??? 日本語

15 July 2015

Home>News>Local News

High-speed Trains to Reach All Hunan’s Cities and Prefecture

2019-04-17 Download Print Comment
The Yuchangxia (Chongqing-Changsha-Xiamen) High-speed Railway, a part of Chinese “Eight Vertical and Eight Horizontal” railway network, accelerates its construction of Hunan sections. 
 
The Hukun (Shanghai-Kunming) High-speed Railway Hunan Company announced on April 15 that, the Changde-Yiyang-Changsha section will start construction this June, and the Qianjiang (Chongqing Municipality) -Zhangjiajie-Changde section will begin a trial operation in November. 
 
The Yuchangxia Railway connects Sichuan and Chongqing area with Central China, and is a high-speed line connecting east and south China. Qianjiang-Zhangjiajie-Changde, Changde-Yiyang-Changsha, and Changsha-Ganzhou (Jiangxi Province) sections are the three parts run through Hunan. At present, the Changsha-Ganzhou section is on preliminaries. The Qianjiang-Zhangjaijie-Changde section is to be completed, and begin debugging in September and trial operation in November. 
 
The main track of the Changde-Yiyang-Changsha Railway is 157.3 km in length. There are five stations along the line – Changde, Hanshou (S), Yiyang (S), Ningxiang (W), and Changsha (W). The designed speed is 350 km per hour. Upon its operation, all of Hunan’s 13 cities and one prefecture can be reached by high-speed trains. 
 
This article is from Hunan Provincial Government. www.ikrwh.icu. 
 
Translator: Pang Yuehui
 
Chinese source: hunan.gov.cn 
 
平码主论坛 五分钟极速6合怎么赢 快三押大小单双技巧 秒速时时在线网站 微信二人斗地主 稳赚包六肖三期必出一期127期 快三二不同号选号技巧 江苏时时大小单双 欢乐生肖一天赚2000技巧 时时彩个位计划全天版 快三大小单双技巧揭秘